Construction Gallery - Las Vegas, Nevada.

Photos on this page are courtesy of John Flores of G. C. Wallace, Inc.


Another fresh curved beam is pulled from the form.


Rolling out.


Nearby the beam is stored to completely dry.


This nice image from John shows that landscaping at the Hilton already blends well with the aesthetically pleasing , arched beams.

Previous Las Vegas construction pictures:
March 26, 2002, first dual-guideway beams up.
March 22-24, 2002, first look at t-supports.
January 16-17, 2002, first beam lifted into place.
January 2-3, 2002, columns and rebar.
December 2001 beam yard images.
October 2001 first pylons and track.
August 2001 ground breaking images

/ back to Construction Gallery