Construction Gallery - Las Vegas,
Nevada.
Sept. 22-25, 2002 photographs by Kim Pedersen.
After crossing the pedestrian bridge, the track turns into the
Hilton Property.
Before reaching the Hilton Station, trains will cross through
a switch platform for a future spur line to the west side of the
Strip.
Here are Granite workers pouring the last wall on the Hilton switch
platform.
Moving northward along the Hilton property, the track makes some
graceful turns on the way to the Sahara.
This view is from the sixteenth floor of the Sahara Hotel. To
the left is a crossover switch.
There's more! Sept 22-25 page 1 / 2 / 3 / 4 / 5 / 6
Previous Las Vegas construction pictures:
August 22,2002
August 5, 2002
July 10-12, 2002
June 27, 2002
June 7-18, 2002.
Late May 2002.
April May, 2002, tall columns.
May 3, 2002, beam manufacturing continues.
March 26, 2002, first dual-guideway beams
up.
March 22-24, 2002, first look at t-supports.
January 16-17, 2002, first beam lifted
into place.
January 2-3, 2002, columns and rebar.
December 2001 beam yard images.
October 2001 first pylons and track.
August 2001 ground breaking images